Question
Download Solution PDFWhich country is in the process of setting up the largest integrated solar-wind energy park of 30 GW capacity?
Answer (Detailed Solution Below)
Detailed Solution
Download Solution PDFAt the COP26, India pledged to achieve 500 GW of installed non-fossil energy capacity by 2030.
Key Points
- Prime Minister Narendra Modi lay the foundation stone for the project in December 2020 which is estimated to generate 30 gigawatts (GW) of power or 30,000 megawatts (MW).
- It will be the world's largest hybrid renewable energy park.
- The Gujarat government provided 1,00,000 hectares of wasteland in Kutch for an energy park.
- The park will generate 30 gigawatts of electricity from solar panels and wind turbines.
- In April 2020, the Ministry of Defence (MoD) approved the usage of 72,600 hectares of the designated area for the park.
Therefore, India is in the process of setting up the largest integrated solar-wind energy park with a 30 GW capacity.
Additional Information
- India agreed to this goal at COP 21 (UNFCCC).
- As of 30 November 2021, India installed Renewable Energy capacity was 150.54 GW.
- It is divided into solar: 48.55 GW, wind: 40.03 GW, Small hydro Power: 4.83, Bio-power: 10.62 and Large Hydro: 46.51 GW.
Last updated on Jun 27, 2025
-> Check out the UGC NET Answer key 2025 for the exams conducted from 25th June.
-> The UGC Net Admit Card has been released on its official website today.
-> The UGC NET June 2025 exam will be conducted from 25th to 29th June 2025.
-> The UGC-NET exam takes place for 85 subjects, to determine the eligibility for 'Junior Research Fellowship’ and ‘Assistant Professor’ posts, as well as for PhD. admissions.
-> The exam is conducted bi-annually - in June and December cycles.
-> The exam comprises two papers - Paper I and Paper II. Paper I consists of 50 questions and Paper II consists of 100 questions.
-> The candidates who are preparing for the exam can check the UGC NET Previous Year Papers and UGC NET Test Series to boost their preparations.