Which of the following parts of the thermal power plant is NOT involved in coal handling?

This question was previously asked in
MPPGCL JE Electrical 28 April 2023 Shift 2 Official Paper
View all MPPGCL Junior Engineer Papers >
  1. Crusher
  2. Magnetic separator
  3. Ball mill
  4. Condenser

Answer (Detailed Solution Below)

Option 4 : Condenser
Free
MPPGCL JE Electrical Fundamentals Mock Test
20 Qs. 20 Marks 24 Mins

Detailed Solution

Download Solution PDF

Among the following options, Condenser is NOT involved in coal handling.

Condenser:

  • The condenser is a part of the steam cycle in a thermal power plant. It plays a role in the steam cycle rather than in coal handling. 
  • It condenses exhaust steam from the turbine into water for reuse in the boiler.

 

Thermal Power Plant and Coal Handling

Coal is the primary fuel for generating electricity in a thermal power plant. The coal handling system is responsible for transporting, crushing, and processing the coal before it is fed into the boiler for combustion.

Coal Handling System Components:

  • Crusher: Used to crush large coal pieces into smaller ones for efficient combustion.
  • Magnetic Separator: Removes ferrous metal impurities from coal to prevent damage to machinery.
  • Ball Mill: A grinding device used to pulverize coal into fine powder before combustion in the boiler.

Latest MPPGCL Junior Engineer Updates

Last updated on May 29, 2025

-> MPPGCL Junior Engineer result PDF has been released at the offiical website.

-> The MPPGCL Junior Engineer Exam Date has been announced.

-> The MPPGCL Junior Engineer Notification was released for 284 vacancies.

-> Candidates can apply online from 23rd December 2024 to 24th January 2025.

-> The selection process includes a Computer Based Test and Document Verification.

-> Candidates can check the MPPGCL JE Previous Year Papers which helps to understand the difficulty level of the exam.

Hot Links: teen patti master 2025 teen patti boss teen patti master list