Which of the following factors is NOT considered for effective and efficient distribution network design?

This question was previously asked in
MPPGCL JE Electrical 01 June 2024 Shift 1 Official Paper
View all MPPGCL Junior Engineer Papers >
  1. Total network area and load density
  2. Availability of backup power sources
  3. Proper division of load among sub-network and transformers
  4. Number of planned or scheduled outages

Answer (Detailed Solution Below)

Option 4 : Number of planned or scheduled outages
Free
MPPGCL JE Electrical Full Test 1
3.9 K Users
100 Questions 100 Marks 120 Mins

Detailed Solution

Download Solution PDF

Explanation:

Effective and Efficient Distribution Network Design

Designing an effective and efficient distribution network involves several critical factors to ensure the seamless delivery of electricity from power generation plants to the end-users. The main objective is to maximize the reliability and performance of the network while minimizing costs and outages. Various considerations must be taken into account, such as load density, network area, availability of backup power sources, and proper division of load among sub-networks and transformers. However, not all factors contribute equally to the network's effectiveness and efficiency. Below, we will analyze why the number of planned or scheduled outages is not considered a significant factor in this context.

Analysis of the Correct Option:

The correct option is:

Option 4: Number of planned or scheduled outages

This option correctly identifies a factor that is not inherently considered when designing an effective and efficient distribution network. Planned or scheduled outages, while important for maintenance and upgrades, do not directly impact the initial design of the distribution network. Instead, they are operational considerations managed by utility companies once the network is already in place. Let us delve into why this is the case:

Planned or Scheduled Outages:

  • Planned outages are necessary for routine maintenance, repairs, and upgrades to the network. They are scheduled in advance to minimize inconvenience to customers.
  • These outages are more about the operational management of the network rather than its design. The design phase focuses on establishing a robust and reliable infrastructure capable of handling the load efficiently.
  • While minimizing the number of outages is a goal, it is achieved through good design practices and effective maintenance strategies rather than being a direct design criterion.

Importance of Other Factors:

To further understand why other factors are considered crucial in distribution network design, let's evaluate them:

Option 1: Total network area and load density

This factor is critical in determining the layout and capacity of the distribution network. The total network area and load density influence the number of substations, the length of distribution lines, and the size of transformers needed. A well-designed network must account for the geographic spread and concentration of load to ensure efficient delivery of electricity.

Option 2: Availability of backup power sources

Backup power sources are essential for maintaining network reliability and ensuring continuous power supply during faults or emergencies. Incorporating backup power sources into the network design helps prevent outages and enhances the system's resilience. This factor is crucial for maintaining the overall reliability and stability of the distribution network.

Option 3: Proper division of load among sub-network and transformers

Effective load division is vital to prevent overloading of any part of the network, which can lead to failures and outages. Properly distributing the load among sub-networks and transformers ensures that each component operates within its capacity, enhancing the network's efficiency and longevity. This factor directly impacts the performance and reliability of the distribution system.

Conclusion:

In conclusion, while planned or scheduled outages are important for the operational management of a distribution network, they are not a primary consideration during the design phase. The focus during design is on creating a robust and reliable infrastructure that can handle the load efficiently and ensure continuous power supply. Factors such as total network area and load density, availability of backup power sources, and proper division of load among sub-networks and transformers are crucial for achieving an effective and efficient distribution network. Understanding these elements is essential for anyone involved in the planning and development of electrical distribution systems.

Latest MPPGCL Junior Engineer Updates

Last updated on May 29, 2025

-> MPPGCL Junior Engineer result PDF has been released at the offiical website.

-> The MPPGCL Junior Engineer Exam Date has been announced.

-> The MPPGCL Junior Engineer Notification was released for 284 vacancies.

-> Candidates can apply online from 23rd December 2024 to 24th January 2025.

-> The selection process includes a Computer Based Test and Document Verification.

-> Candidates can check the MPPGCL JE Previous Year Papers which helps to understand the difficulty level of the exam.

Get Free Access Now
Hot Links: teen patti yes teen patti real money app teen patti game teen patti fun