Question
Download Solution PDFAs per the Software Engineering Institute (SEI), the correct sequence is
A. Initial
B. Repeatable
C. Managed
D. Optimizing
E. Defined
Choose the correct answer from the options given below:
Answer (Detailed Solution Below)
Option 2 : A, B, E, C, D
Detailed Solution
Download Solution PDFThe correct answer is : option 2
Key Points
As per the Software Engineering Institute (SEI), the correct sequence for the Capability Maturity Model Integration (CMMI) levels is:
- Initial
- Repeatable
- Defined
- Managed
- Optimizing
This sequence reflects the stages of maturity that organizations go through as they improve their software engineering processes. Therefore, the correct answer, which aligns with option 2, is:
Option 2: A, B, E, C, D