Download Solution PDFConsider the following statements with respect to cubical content method.
I. This is a preliminary estimate.
II. This is an approximate estimate.
Which of the following options is true?
Answer (Detailed Solution Below)
Detailed Solution
Download Solution PDFConcept:
Approximate estimate:
- A preliminary or approximate estimate is required for studies of various aspects of the work of the project and for its administrative approval.
- It can decide, in the case of commercial projects, whether the net income earned justify the amount invested or not.
- The estimate is accompanied by a report duly explaining the necessity and utility of the project and with a site or layout plan.
Following are the methods of approximate estimates:
- Plinth area method
- Cubical contents methods.
- Unit base method
Last updated on Jul 1, 2025
-> SSC JE notification 2025 for Civil Engineering has been released on June 30.
-> Candidates can fill the SSC JE CE application from June 30 to July 21.
-> SSC JE Civil Engineering written exam (CBT-1) will be conducted on 21st to 31st October.
-> The selection process of the candidates for the SSC Junior Engineer post consists of Paper I, Paper II, Document Verification, and Medical Examination.
-> Candidates who will get selected will get a salary range between Rs. 35,400/- to Rs. 1,12,400/-.
-> Candidates must refer to the SSC JE Previous Year Papers and SSC JE Civil Mock Test, SSC JE Electrical Mock Test, and SSC JE Mechanical Mock Test to understand the type of questions coming in the examination.
-> The Staff Selection Commission conducts the SSC JE exam to recruit Junior Engineers in different disciplines under various departments of the Central Government.