Srisailam Hydroelectric Power Plant is built on which river?

This question was previously asked in
NVS Junior Secretariat Assistant (LDC) 2019 (Shift 1)
View all NVS Junior Secretariat Assistant Papers >
  1. Tungabhadra River
  2. Penna River
  3. Krishna River
  4. Godavari River

Answer (Detailed Solution Below)

Option 3 : Krishna River
Free
NVS Junior Secretariat Assistant Full Test 1
14.8 K Users
130 Questions 130 Marks 150 Mins

Detailed Solution

Download Solution PDF

The correct answer is Krishna River.

Key Points

  • The Srisailam Dam is located in the Kurnool district of Andhra Pradesh.
  • Srisailam hydroelectric power project is constructed across the Krishna River.
  • The Srisailam project is the 12th largest capacity hydroelectric project in the country.
  • The 512 m long and 145 m high dam was constructed in a deep gorge.
  • The left bank hydroelectric power station generates 6 X 150 MW of power and the right bank generates 7 X 110 MW of power.
  • Srisailam dam forms the reservoir with a gross storage of 215 TMC ft.
  • The Srisailam hydroelectric power station is the third-largest construction project in India.

Important Points

  • The Koyna Hydroelectric Project is the largest completed hydroelectric plant in India.
  • Its power capacity is 1920 megawatts.
  • The first hydroelectric power station was the Shivanasamudra hydroelectric power station.
  • Tehri Hydro Power Plant is the tallest hydropower project in the country, and Terry Dam is also the tallest hydropower plant in India.
  • The Nathpa Jhakri Hydroelectric Power Plant is the largest underground hydroelectric project in the country.

Additional Information 

Hydroelectric Power Plant River State
Bhakra Nangal Hydroelectric Power Plant Sutlej River Himachal Pradesh
Tehri Hydro Electric Power plant Bhagirathi Uttarakhand
Hirakud Hydro Electric Power plant Mahanadi Odisha
Nagarjunasagar Hydro-Electric Power Plant Krishna River Andhra Pradesh
Sardar Sarovar Hydro Electric Power plant Narmada river Gujarat
Koyna Hydroelectric Power plant Koyna River Maharashtra
Balimela Hydro Electric Power plant Sileru Odisha
Latest NVS Junior Secretariat Assistant Updates

Last updated on May 13, 2025

-> The NVS JSA Hall Ticket has been released for the CBT of the ongoing 2024 cycle.

-> The exam will be conducted from 14th to 19th May 2025.

-> The NVS Junior Secretariat Assistant 2024 Notification was released for total of 381 vacancies.

-> The selection process includes a Computer Based Test and Typewriting Test.

Get Free Access Now
Hot Links: teen patti joy official teen patti jodi teen patti gold new version 2024